Manage issues
Issues are the problems your team has to solve: clash groups, single clashes, failed IDS checks, correspondence findings or anything you raise yourself. The Issues tab collects them all, so you can assign, discuss and close them in one place, export them for other tools, and let the Agent do the routine work.
1. Know the issue statuses
Every issue has one status. Change it in the issue's row or detail; Viewers can change it too.
| Status | Meaning |
|---|---|
| Open | Raised and waiting for someone to work on it. |
| In progress | Someone is on it. An issue update also moves an open issue here when some of its clashes are gone. |
| Resolved | Fixed. Set it with Resolve, or let an issue update do it when every tracked clash is gone. Reopen brings it back. |
| Archived | No longer followed, for example an issue merged into another one. It stays readable. |
Besides the status, an issue has a severity (High, Medium or Low, taken from the clash group), a type such as Clash, IDS or Correspondence, labels, an assignee and a due date. An open or in-progress issue whose due date has passed counts as overdue on the dashboard.
2. Find your way in the issue list
Open Issues in the left rail.
- Counts (1): all issues, open, in progress, resolved and high severity.
- Tools (2): Issue update and New issue.
- Search and filters (3): search any text, such as a check's prefix, and filter by Status, Severity, Type, Assignee and Label.
- Checks (4): issues are grouped by the check they come from, for example [DS] Av1. The checkbox on a check selects all its issues.
- Inline fields (5): change status, severity, type, assignee and due date directly in the row.
3. Open an issue
Click an issue to open it below its row. The viewer shows the objects of the issue.
- Status (1) and the other fields stay editable in the row.
- The header (2) shows the title, the models and versions, and links to the check and the group that hold its clashes: the newest check that still finds them, here Av1-Sv1-HVACv1 · Group 10 · 6 clashes. ⋯ holds Delete.
- The snapshot (3) restores the captured view when you click it.
- Resolve (4) closes the issue.
- Comments (5): write a comment, and attach a snapshot of the current view with the camera button.
- Clashes (6): for a clash issue, every clash with its two objects and its state: Detected while the clash is still there, Cleared once an issue update no longer finds it. The heading counts the cleared ones, for example 2/6.
4. Raise an issue yourself
Click + (1) to raise an issue that does not come from a check, for example a note for the architect. Enter a title and, optionally, a description, set status, severity, type, labels, assignee and due date, and click the check mark (2).
Without selected objects, the issue is saved for the whole model. To link objects, select them in the viewer first.
You can also create an issue from any object: right-click it in the viewer and choose Create issue.
5. Export issues
Tick issues, or the checkbox of a check to take all its issues (1). The toolbar then offers Issue update to recheck them and Export (N) (2). Choose a format (3):
| Format | Use it for |
|---|---|
| BCF 2.1 (.bcf) | Open the issues in Revit, Solibri, Navisworks, BIMcollab and other BCF tools, with their viewpoints and snapshots. |
| BCF (Dalux) (.bcf) | Import the issues into Dalux. Status and priority use Dalux's German names when SiloLink is set to German, otherwise its English ones. |
| PDF (.pdf) | Share a readable list, for example in a coordination meeting. |
| Word (.docx) | Edit the list before you send it. |
| Excel (.xlsx) | Sort, filter and track the issues in a spreadsheet. |
6. Work on issues with the Agent
The Coordination Agent reads and edits issues like a team member, with your permissions. It asks before every change. Some things to ask:
| Goal | Ask, for example |
|---|---|
| Get an overview | Summarize the open issues by check and severity. Which are overdue? |
| Plan the week | Which High issues are assigned to nobody? Assign the structural ones to Lea and set Friday as the due date. |
| Find duplicates | Are there issues about the same problem? Merge the duplicates. |
| Create issues | Create one issue per High group of [DS] Av1. or Raise issues for the problems of the last IDS run. |
| Follow up | Recheck the open clash issues on the newest HVAC version and tell me which are fixed. |
| Discuss | Add a comment to issue 12: the opening is confirmed by the structural engineer. |
Issue numbers, checks and members are easiest to name with @. Every change shows up in the issue as usual, so the team sees what happened.